| Interstate 5 and 41st Street/Broadway Interchange and Arterial Improvement Project, Everett | $3,180 |
| SR 704 Cross-Base Highway, Spanaway Loop Road to SR 7 | $1,200 |
| Plan to relieve traffic until North-South freeway Hwy 2 | $440 |
| Widening SR 527 from 2 lanes to 5 from Bothell to Mill Creek | $1,200 |
| SR 518 3rd lane construction, King County | $1,600 |
| Coal Creek Parkway Bridge Replacement, Newcastle WA | $800 |
| SR 9 and 20th St. SE Intersection Reconstruction in Snohomish County | $250 |
| Issaquah Historical Society, Issaquah Valley Trolley Project | $200 |
| Complete preliminary engineering and environmental analysis for SR 14 through Camas and Washougal | $1,500 |
| Port of Tacoma Rd.'Construct a second left turn lane for traffic from westbound Pac. Hwy E. to Port of Tacoma Rd. and I'5 | $400 |
| Granite Falls Alternate Freight Route in Granite Falls | $2,834 |
| Auburn, Washington'M Street SE rehabilitation between 29th Street SE and 37th Street SE | $400 |
| Tukwila Urban Access Improvement Project'Address necessary improvements to Southcenter Parkway in Tukwila to relieve congestion | $800 |
| Design and construct improved I'182 interchange ramps at Broadmoor Blvd. in Pasco, WA | $1,600 |
| Conduct route analysis for community pathway through Chehalis | $50 |
| Construct a multi-jurisdictional non-motorized transportation project parallel to SR 99 called the Interurban Trail | $1,600 |
| SR 2/Main Street/Old Owen Road Intersection in Monroe | $384 |
| Congestion relief on I'405 with added lanes from SR 520'SR 522 including 2 lanes each way from NE 85th-NE 124th | $800 |
| Buckley, WA; New Road alignments on 112th Street Corridor | $1,600 |
| East Marine View Drive Widening in Everett | $3,500 |
| 510'507 Loop'Conduct engineering, design, and ROW acquisition for alternative route to two existing highways that bisect Yelm, WA | $2,000 |
| The West Corridor Coalition in Washington State | $250 |
| North Sound Connecting Communities Transportation Project Planning | $960 |
| Widen I'5 through Lewis County | $3,750 |
| Redmond, WA City-wide ITS | $800 |
| Complete final Columbia River crossing Environmental Impact Statement for SR 35 in Klickitat County | $640 |
| Pedestrian Sidewalk Construction in Snohomish. | $140 |
| Alaskan Way Viaduct and Seawall. | $11,200 |
| Improve I-5 interchange at 134th Street in Clark County | $10,772 |
| SR 167--Right-of-way acquisition for a new freeway connecting SR 509 to SR 161. | $2,000 |
| Perform final interchange design and property acquisition at Fleshman Way where it crosses SR 129, that enhances safety and passenger and freight mobility and reduces congestion | $840 |
| Roosevelt Extension at Urban Avenue to Cameron Way in Mount Vernon. | $3,200 |
| Design and construct pedestrian land bridge spanning SR 14 | $2,000 |
| Install dual left turn lanes and intersection signal modifications at SR 432 and Columbia Blvd. | $1,750 |
| Issaquah SE Bypass. | $4,000 |
| Reconstruction of SR 99 (Aurora Ave. N) between N 145th St. and N 205th St | $1,600 |
| SR 518 corridor-- Improvements to SR 518-509 interchange and addition of eastbound travel lane on a portion of the corridor | $800 |
| Conduct preliminary engineering and EIS for Columbia River Crossing in WA and OR. | $7,000 |
| Construct a tunnel as part of the Bremerton Pedestrian-Bremerton Transportation Center Access Improvement project | $16,800 |
| Restore and construct historic Naches Depot and Trail project. | $400 |
| Kent--Construct a single point urban interchange (SPUI) under I-5 at South 272nd St | $800 |
| Intersection project at South Access/522 beginning and ending at the UWB-CCC campus to improve access and alleviate congestion | $2,400 |
| Tacoma--Lincoln Avenue Grade Separation | $800 |
| Kent, WA Willis Street BNSF Railroad Grade Separation Project. | $400 |
| Terry's Corner Park and Ride on Camano Island. | $1,120 |
| To replace BNSF trestle, Sammamish River bridge and reconstruct SR 202/127th Pl. NE and SR 202/180th Ave. NE intersections. | $1,600 |
| SR 538 (College Way) and North 26th St. Signal in Mount Vernon | $140 |
| Design Valley Mall Blvd. for Main St. to I-82 and two I-82 interchanges at Mileposts 36 and 38 in Union Gap, WA. | $5,120 |
| Extension of Waaga Way west to Old Frontier Rd | $400 |
| Purchase of scenic easement or site at I-90 and Highway 18 | $480 |
| Fife--Widen 70th Ave. East and Valley Ave. East | $800 |
| I-90 Two-Way Transit-HOV Project. | $3,200 |
| U.S. 12 Burbank to Walla Walla: Construct new four lane highway for portion of U.S. 12 | $3,440 |
| Construct an off-ramp from I-5 to the intersection of Alderwood Mall Blvd. and Alderwood Mall Pkwy. | $400 |
| Improve Willapa Hills bicycle and pedestrian trail between Chehalis and Pacific County | $700 |
| Construct 6 mile span over I-5 in Thurston County to connect Chehalis Western Trail. | $4,108 |
| SR 543 Interstate 5 to International Boundary Enhancement in Blaine. | $3,000 |
| U.S. 395, North Spokane Corridor Improvements. | $4,640 |
| Bridge Modification and Interstate Highway Protection Project, Skagit River, in Skagit County. | $3,000 |
| Complete analysis, permitting and right-of- way procurement for I-5/SR 501 Interchange replacement in Ridgefield. | $600 |
| Cultural and Interpretive Center (Hanford Reach National Monument) facility, Richland, WA | $1,280 |
| Federal Way Triangle-- Conduct final engineering work for the reconstruction of the I-5-- SR 18 interchange. | $1,600 |
| New Country Road on Whidbey Island | $960 |
| SR 18 Widening, Maple Valley to I-90 | $6,000 |
| Improvements in the SR 9 corridor in Snohomish County | $1,200 |
| Continuing construction of I-90, Spokane to Idaho State Line | $2,640 |
| Rebuild and widen Cemetery Road bridge over U.S. Bureau of Reclamation canal near Othello, WA | $160 |
| SR 2/Kelsey Street Intersection Improvements in Monroe. | $832 |
| Enumclaw, WA Welcome Center | $1,200 |
| Expand size and improve safety Lewis and Clark Discovery Trailhead and Scenic Overlook. | $146 |
| Maple Valley SR 169 and SR 516 improvements | $800 |
| SR 28 and SR 285 Sellar Bridge Improvements: ramp and roadway network improvements at the west end and a new lane on the Sellar Bridge. | $4,000 |
| International Mobility and Trade Corridor Project for Whatcom County | $1,040 |
| Conduct study for I-5 and SR 503 interchange | $300 |
| Implement Red Mountain Area Vision transportation plan, includes Webber Canyon Road realignment at existing I-82 Kiona-Benton interchange and new Red Mountain I-82 interchange at SR 224. | $2,800 |
| Renton, WA SR 167 HOV, Strander Boulevard Connection | $800 |
| Extend 18th Street between 87th Avenue and NE 192nd Avenue in Vancouver. | $3,200 |
| U.S. 2/Sultan Basin Road Improvements in Sultan | $480 |
| Construct SR 9 Pedestrian Overpass in Arlington. | $880 |
| Engineering and Construction of the Centennial Trail in Snohomish. | $800 |
| Development of highway-rail crossings in Spokane County, WA and Kootenai County, ID | $800 |
| 267th Street NW Pedestrian Path in Stanwood | $480 |
| Realign West Main Street through Kelso. | $2,000 |
| Improve Wahkiakum County Ferry landing. | $250 |
| 116th St/Interstate 5 Interchange Reconstruction in Marysville. | $1,400 |
| Guard Street Reconstruction Project in Friday Harbor | $640 |
| 5th Street/US 2 Signalization Improvements in Sultan. | $80 |
| Port of Bellingham Transportation Enhancement Projects | $7,280 |
| Kent, WA Willis Street UP Railroad Grade Separation Project. | $400 |
| Access Downtown Phase II: I- 405 Downtown Bellevue Circulation Improvements | $9,200 |
| I-405-SR 167 interchange-- Rebuild the interchange and add additional lanes to relieve congestion. | $1,600 |
| SR 704 Cross-Base Highway, Spanaway Loop Road to SR 7 | $4,000 |
| Construct a single point urban interchange (SPUI) under I-5 at South 272nd St | $1,080 |
| Fruitdale and McGarigle Arterial Improvements Project in Sedro Woolley, Washington | $760 |
| Realign Airport Road/ Springhetti Ave./Marsh Road in Snohomish County, Washington | $250 |
| Olympia Infrastructure Enhancement Project. | $684 |
| Improve Mill Plain Blvd. between SE 172nd and SE 192nd in Vancouver | $1,250 |
| Improve signage along scenic highways in Clark, Skamania and Pacific counties | $60 |
| Widen SR 503 through Woodland | $1,000 |
| SR 518 corridor-- Improvements to SR 518-509 interchange and addition of eastbound travel lane on a portion of the corridor | $4,000 |
| Design and construct pedestrian land bridge spanning SR 14 | $2,500 |
| Riverside Avenue Improvements, Phases 2 and 3, Spokane | $2,500 |
| Hanford Reach National Monument Road Improvement. | $1,500 |
| Town Square Roadway and Pedestrian Improvements, Burien | $2,500 |
| SR 704 Cross-Base Highway Improvements, Spanaway Loop Road to SR 7. | $2,000 |
| Tukwila Southcenter Parkway Improvements, Tukwila. | $3,000 |
| Federal Way Triangle-- Conduct final engineering work for the reconstruction of the I-5-- SR 18 interchange. | $4,000 |
| U.S. 12 Burbank to Walla Walla: Construct new four lane highway for portion of U.S. 12 | $2,500 |
| Reconstruction of SR 99 (Aurora Ave. N) between N 145th St. and N 205th St | $1,000 |
| Access Downtown Phase II: I- 405 Downtown Bellevue Circulation Improvements | $1,500 |
| Seattle Ferry Terminal Redevelopment and Expansion. | $2,000 |
| Port of Bellingham Transportation Enhancement Projects | $2,500 |
| Toroda Creek Road Improvements, Ferry County | $1,650 |
| Toroda Creek Road Improvements, Okanogan County | $850 |
| Conduct preliminary engineering and EIS for Columbia River Crossing in WA and OR. | $1,000 |
| U.S. 395, North Spokane Corridor Improvements. | $2,000 |
| 116th St/Interstate 5 Interchange Reconstruction in Marysville. | $1,000 |
| SR 167--Right-of-way acquisition for a new freeway connecting SR 509 to SR 161. | $7,500 |
| Roadway and Pedestrian Improvements at Burien Town Square, Burien. | $1,500 |
| Complete analysis, permitting and right-of- way procurement for I-5/SR 501 Interchange Replacement in Ridgefield. | $8,400 |
| Construct improvements to Multimodal Terminal, Bainbridge Island. | $2,500 |
| Construct Intermodal Transit Facility, City of University Place | $3,250 |
| Streetscape University Place Downtown, City of University Place | $2,800 |
| Plan and Improve freight and goods transport--The West Cost Corridor Coalition in Washington State. | $500 |
| Continuing construction of I-90, Spokane to Idaho State Line | $7,300 |
| Tukwila Urban Access Improvement--Address necessary improvements to Southcenter Parkway in Tukwila to relieve congestion | $1,750 |
| Takoma--Lincoln Ave. Grade Separation | $1,500 |
| Widen SR 202/SR 520 to Sahalee Way, King County | $1,750 |
| Improve Vancouver traffic management--Vancouver Advanced Traffic Management System, Vancouver. | $500 |
| SR 240/Stevens Drive Corridor Improvements, interchange construction and graded rail crossing separation at intersection of SR 240 and Van Giesen Street, Richland | $2,750 |
| Alaska Way Viaduct and Seawall Replacement | $100,000 |
| Replacement of the Alaskan Way Viaduct and Seawall in Seattle | $120,000 |
| "IIwaco, WA Procure shuttles for Lewis and Clark National Historical Park " | $84 |
| "Ilwaco, WA Construct park and ride " | $84 |
| "Island Transit, WA Operations Base Facilites Project " | $2,006 |
| "Mukilteo, WA Mulit-Modal Terminal " | $4,849 |
| "North Bend, Washington-Park and Ride" | $669 |
| "Oak Harbor, WA Mulitmodal Facility " | $836 |
| "Seattle, WA Mulitmodal Terminal Redevelopment & Expansion " | $3,800 |
| "Snohomish County, WA Community Transit bus purchases and facility enhancement " | $2,508 |
| "Thurston County, WA Replace Thurston County Buses " | $752 |
| "Washington, King Street Transportation Center-Intercity Bus Terminal Component " | $250 |
| Washington Southworth Terminal Redevelopment | $5,000 |